首页
帮助(新窗口) 公司介绍
首页
工程业绩
公司动态
公司介绍
联系我们
企业文化
企业资质
视频演示
文档集
业务范围
咨询规划
登录
 


 


 

 

Nanjing Longtan Phase 2 Bulk Cargo Terminal

Nanjing Longtan Phase 2 Bulk Cargo Terminal
client: Nanjing Port Construction Command
date: 2001-2003                      place: Longtan of Nanjing
service scope: Engineering feasibility study, preliminary design and detail design. The design contents include general layout, natural conditions analysis, marine structures, civil works structure, technology, power supply, communication, control, water supply, drainage, fire-fighting, environmental protection, heating and ventilation etc. and relative investment estimation.
project brief:   Constructing one 50,000DWT and two 5,000DWT Yangtze River berths with marine structures compatible to 50,000DWT ships, the design annual throughput is 8,800,000 tons. Transshipping ore to the specialized berths of various iron and steel plants along the Yangtze River.